China Hai Cheng’s Sulfur Granulation Plant Project on Jurong Island, Singapore
Based on the characteristics of our client’s goods, our company has developed a tailored logistics plan. Ultimately, Shanghai Port was designated as the primary loading port, and shipments were arranged in batches and by vessel type according to the specific nature of the cargo. In 2020, the sudden outbreak of the pandemic introduced new challenges to the overall project schedule, coordination, and personnel safety. Despite these significant difficulties, San Ying successfully overcame numerous obstacles, ensuring that the project arrived at the site on time and safely.
Category: Project Cases
finance07@shininggroup.com.cn
- Case Description
Relevant Cases
Cooperative Consulting
If you have any other needs, feel free to leave a message—we’ll get back to you as soon as we receive it!